Search scope:
排序: Display mode:
Construction technology of well shaft tower construction engineering
Yang Yiming,Huang Jiapin,Shen Xihua,Cao Yueqin and Ma Zhimin
Strategic Study of CAE 2012, Volume 14, Issue 2, Pages 85-89
Keywords: parallel operations well tower sliding shaft equipment elevator installation construction technology
Elevator Configuration Based on the Markov Network Queuing Model
Zong Qun,Cheng Yiju,Song Junyuan
Strategic Study of CAE 2003, Volume 5, Issue 10, Pages 69-72
The article applies the Markov network theory to build the elevator traffic model.Based on the model elevator configuration parameters of the serving stations are calculated, comparingMeanwhile the result shows the validity and feasibility of the method applied to elevator configuration
Keywords: Markov network queuing theory elevator traffic model optimizing elevator configuration
Modeling and Analysis of Elevator System Based on Timed-Coloured Petri Net
Zong Qun,Dou Liqian,Cheng Yiju
Strategic Study of CAE 2004, Volume 6, Issue 12, Pages 51-55
In this paper, an elevator running model based on timed-coloured Petri net is proposed.The running of elevator is classified according to the model.The running of elevator is controlled by the command of controller.of controller is composed of the color aggregates which have a connection with the running states of elevatorIn the end, an example of the application of the model in single elevator system and the elevator group
Keywords: Petri net timed-coloured Petri net the model of elevator the running of elevator
Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium
GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong
Frontiers of Structural and Civil Engineering 2008, Volume 2, Issue 1, Pages 87-92 doi: 10.1007/s11709-008-0005-y
Keywords: practical new-type installation consistent Gymnasium
Installation technology of counterweight system of Three Gorges Project ship lift
Cai Chunhua and Luo Bin
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 70-76
The installation technology of counterweight system of Three Gorges ProjectThe overall installation procedure of counterweight system has been put forward which are suitable forThen the construction processes and construction methods of balance chain guide installation, balancingpulley installation, main hoist rope installation and counterweight installation have been describedAt the same time, the installation technology system of counterweight system is set up.
Keywords: Three Gorges Project ship lift counterweight system installation procedure installation technology
Xianming SHI
Frontiers of Structural and Civil Engineering 2016, Volume 10, Issue 1, Pages 1-11 doi: 10.1007/s11709-016-0312-7
Keywords: arc sprayed Zn anode replacement reinforced concrete bridge preservation neural networks surface profile
C. RENNO, A. PERONE
Frontiers in Energy 2021, Volume 15, Issue 2, Pages 384-395 doi: 10.1007/s11708-020-0717-9
Keywords: CPV system point-focus experimental model energy and economic analysis
Installation and demolition technology of Bailey truss of Three Gorges Project ship lift
Liu Yong,Chen Jianxia
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 77-82
The installation and demolition of Bailey truss support system of Threeof the narrow construction site, high construction strength, and big construction disturbance, the installationThe installation and demolition technology system of bailey truss support system has been establishedThis technology system ensures the smooth implementation of the installation and demolition of bailey
Keywords: ship lift Bailey truss installation demolition Three Gorges Project
The split installation and application of offshore wind turbine generator systems
Sun Guangxi,Huang Yaxin
Strategic Study of CAE 2010, Volume 12, Issue 11, Pages 53-59
The installation methods used in offshore wind farm around the worldwere summarized, and the process of split installation, the set necessity and principles of assemblyAn installation method was proposed by sitting of the diving boat.The diving installation ship was made by installing a crane, and was located in the seabed during theThe installation method is suitable for offshore wind farm construction.
Keywords: offshore wind farm method of assembled on shore method of split installation application
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 91-96
According to technology requirements of installation precision and characteristicsmethod and installation accuracy control elements have been in detailed analysis, put forward the suitablerack, nut column installation construction process and control measures for Three Gorges Project shipIn engineering practice, use the test of datum point to control installation precision of the rack andThus various high precision standard technical difficulties of installation of the rack, nut column,
Keywords: Three Gorges Project ship lift rack nut column installation of control precision control
Wei Shuman,Zhang Weiming and Li Chenzhi
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 87-90
Keywords: ship lift metal structure embedded parts high precision installation technology Three Gorges Project
Design and Experimental Research on a New Pipe Rupture Valve
HU Guo-liang, XU Bing, YANG Hua-yong, ZHANG Yi-ding
Frontiers of Mechanical Engineering 2006, Volume 1, Issue 1, Pages 26-32 doi: 10.1007/s11465-005-0009-4
A new pipe rupture valve for hydraulic elevator is designed.Mathematical models established for the hydraulic elevator system are used in numerical simulations onThe effects of different viscous damping diameters, inlet pressures of pipe rupture valve, and elevatorloads on the hydraulic elevator system s dynamic performance are analyzed.Experimental research is also carried out using a hydraulic elevator experiment rig.
Keywords: Mathematical designing requirement numerical hydraulic elevator EN81-2 standard
Availability growth models and verification of power equipment
Jinyuan SHI, Jiamin XU
Frontiers in Energy 2021, Volume 15, Issue 2, Pages 529-538 doi: 10.1007/s11708-019-0624-0
Keywords: system power equipment electric generating unit power station auxiliary transmission and distribution installation
Shu CHEN, Menghan SHANG, Jianping WANG
Frontiers of Engineering Management 2021, Volume 8, Issue 1, Pages 135-147 doi: 10.1007/s42524-020-0125-1
Keywords: vertical ship lift initial fire fire evacuation numerical simulation stair elevator
Research on the special lifting device for steel box girders of Sutong Bridge
Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 65-70
Sutong Bridge is a cable stayed bridge with a steel box girder and a main span of 1 088 m. The steel box girder of main-span includes five portions: back span large unit, large block of pylon, standard girder, back span closure girder and middle span closure girder. Each back span large unit was fabricated by welding several deck segments together in factory, and was erected by floating crane. Due to the high of navigational clearance of the main bridge, the traditional truss lifting device couldn't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight. Hence, a kind of lighter lifting device for the erection of back span large units was accepted for this bridge. In this paper, the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method. Because the bridge's navigation clearance is high, and the girder segment is wide and heavy, the meteorology and hydrology condition of the bridge district is abominable, and the requirements of long cable girder side pull-in, structure and performance propose high request to the lifting gantry. In this paper, key points of designing and using long cable pull-in angle adjustment device integrate into lifting gantry are introduced.
Keywords: Sutong Bridge large units lifting device cantilever installation lifting gantry design and use
Title Author Date Type Operation
Construction technology of well shaft tower construction engineering
Yang Yiming,Huang Jiapin,Shen Xihua,Cao Yueqin and Ma Zhimin
Journal Article
Elevator Configuration Based on the Markov Network Queuing Model
Zong Qun,Cheng Yiju,Song Junyuan
Journal Article
Modeling and Analysis of Elevator System Based on Timed-Coloured Petri Net
Zong Qun,Dou Liqian,Cheng Yiju
Journal Article
Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium
GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong
Journal Article
Installation technology of counterweight system of Three Gorges Project ship lift
Cai Chunhua and Luo Bin
Journal Article
Experimental and modeling studies on installation of arc sprayed Zn anodes for protection of reinforced
Xianming SHI
Journal Article
Energy and economic analysis of a point-focus concentrating photovoltaic system when its installation
C. RENNO, A. PERONE
Journal Article
Installation and demolition technology of Bailey truss of Three Gorges Project ship lift
Liu Yong,Chen Jianxia
Journal Article
The split installation and application of offshore wind turbine generator systems
Sun Guangxi,Huang Yaxin
Journal Article
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Journal Article
High precision installation technology of metal structure embedded parts of Three Gorges Project ship
Wei Shuman,Zhang Weiming and Li Chenzhi
Journal Article
Design and Experimental Research on a New Pipe Rupture Valve
HU Guo-liang, XU Bing, YANG Hua-yong, ZHANG Yi-ding
Journal Article
Availability growth models and verification of power equipment
Jinyuan SHI, Jiamin XU
Journal Article
Evacuation strategies for vertical ship lift during initial fire: Integrated application of stairs and elevators
Shu CHEN, Menghan SHANG, Jianping WANG
Journal Article